Bathroom Remodeling
Bathroom Remodeling

The bathroom you actually want.

Full bathroom renovations from demolition to tile — waterproofed properly, finished beautifully.

Overview

Built for the way we live up here.

Bathroom renovations are 60% waterproofing and 40% finishes. Skip the first part and the second part rots out in five years.

Every square inch behind the tile is either a barrier to water or a failure waiting to happen. We use Schluter waterproofing systems, uncoupling membranes, and proper sloped mud beds — the boring parts that make the pretty parts last 30 years.

  • Full demolition and disposal
  • Schluter Kerdi waterproofing on walls and floors
  • Walk-in tile showers, freestanding tubs, alcove tubs
  • Custom vanities in local hardwood
  • Heated tile floors
  • Ventilation upgrades to keep the room dry
Process

How the job actually runs.

01

Request

Call or fill the free-estimate form. We ask a few questions to make sure we're the right fit before we drive out.

02

Inspect

We walk the property with you, measure, photograph, and talk through options honestly — including options that don't need us.

03

Quote

You get a written, itemized quote with materials, labour, timeline, and payment schedule. No verbal ballparks.

04

Build

Our own crew executes on the days we promised. Clean site every night. You get progress updates, not radio silence.

Pricing

What actually moves the price.

We don't post prices online because every property is different — and honest quotes come from seeing the work. Here's what changes the number.

01Property size and access — a two-storey lakefront is not the same as a bungalow off the highway.
02Material grade — architectural shingles, standing-seam metal, cedar, engineered composites all sit at different price points.
03Existing condition — hidden rot, poor previous work, or code upgrades add scope.
04Season and timeline — winter and rush jobs cost more than something scheduled six weeks out.
Questions

Answered before you ask.

Powder room: 5–7 working days. Full bath with tile: 12–20 working days. Main-bath rebuild with layout changes: 18–25 working days.

Yes — supply lines, drains, and fixture install. Coordinated with a licensed plumber for permit-required work.

Absolutely. Marginal cost during a full reno, dramatic comfort upgrade in the winter.

For a family home with kids: keep at least one tub. For a master suite: walk-in shower every time.

Plastic barrier at the door, negative-pressure dust containment during demo, shoe covers, and daily clean-up.

Schluter Kerdi on walls and pans, or a properly built hot-mopped mud pan for large custom showers. Nothing behind our tile is untested.

Related

Explore more of what we do.

Free · No obligation

Ready to start your project?

Get a written estimate from a local crew that will actually show up. Same team from quote to keys.