Remodeling
Remodeling

Renovations, done once, done right.

Kitchens, bathrooms, basements, and additions — one crew, one contract, one point of contact.

Overview

Built for the way we live up here.

Remodeling is where general contracting earns its name. Coordinating framing, plumbing, electrical, drywall, tile, cabinetry, and finish carpentry inside a house you're still living in is a project management job as much as a building job.

The horror stories you hear about renovations almost always trace back to the same thing: multiple sub-contractors with nobody in charge. We run every trade under one contract with one point of contact and one crew you actually meet.

  • Kitchen, bathroom, and basement renovations
  • In-house carpentry, framing, and finish trades
  • Coordinated plumbing and electrical
  • Custom cabinetry through vetted local shops
  • Written schedule, weekly progress reports
  • Fixed-price contracts with no verbal ballparks
Process

How the job actually runs.

01

Request

Call or fill the free-estimate form. We ask a few questions to make sure we're the right fit before we drive out.

02

Inspect

We walk the property with you, measure, photograph, and talk through options honestly — including options that don't need us.

03

Quote

You get a written, itemized quote with materials, labour, timeline, and payment schedule. No verbal ballparks.

04

Build

Our own crew executes on the days we promised. Clean site every night. You get progress updates, not radio silence.

Pricing

What actually moves the price.

We don't post prices online because every property is different — and honest quotes come from seeing the work. Here's what changes the number.

01Property size and access — a two-storey lakefront is not the same as a bungalow off the highway.
02Material grade — architectural shingles, standing-seam metal, cedar, engineered composites all sit at different price points.
03Existing condition — hidden rot, poor previous work, or code upgrades add scope.
04Season and timeline — winter and rush jobs cost more than something scheduled six weeks out.
Questions

Answered before you ask.

3–6 weeks depending on cabinetry lead time and layout changes. We can usually keep one working area of the kitchen live for most of the project.

Yes if you have a second bathroom. If not, we work fast — most single-bath demos to done in 12–15 days.

For kitchen and bathroom projects, yes. Cabinet layout and elevation renderings are part of the design phase.

In writing, priced, and signed before any change is executed. No surprises on the final invoice.

Our own carpenters and lead trades — not day-labour, not new subs every week.

Yes — see the Financing page for current terms.

Related

Explore more of what we do.

Free · No obligation

Ready to start your project?

Get a written estimate from a local crew that will actually show up. Same team from quote to keys.